    News
High altitude hoisting safety measures

1, the suspended height of personnel should be linked to the safety belt, the first use of the safety belt should be in line with the current national standard "safety belt".
2, the construction process, the use of dense mesh type safety of the building is closed (or to take temporary side protection measures).
3, construction process, should take effective measures to the construction site and the construction of a variety of holes and fixed firmly.
4, the concentration of personnel and the entrance to the entrance should be built to protect the shelter.
5, high altitude operation of the safety technical measures should be determined in the construction plan, and in the construction of the completion, the final acceptance confirmation to meet the requirements.
6, high-altitude operations personnel should be regularly carried out medical examination.
7, in the hole with the height of the hole edge of the work must be set up protective facilities, including the formation of the construction process of the depth of the hole in the 2M and above the hole, the groove edge and due to the installation of equipment, pipeline reserved hole, etc..
8, a smaller hole, should be used to cover a solid cover, the cover should be able to prevent displacement; the larger hole in addition to the hole in the hole with a safety net or cover seal, but also in the entrance to protect the railings.
9, the wall is located in the vertical hole (such as the elevator wellhead, pipeline wellhead), in addition to the wellhead at the entrance of a protective railing or fixed gate, the well road should be every 10m set a flat network.
10, the vehicle type crane in addition to regular maintenance, but also should be carried out regularly every year, including the rated load, overload test, testing its mechanical performance, structural deformation and load capacity, can not reach the requirements, should be reduced.